MyFloridaCode.com

[Florida Code Talk] Wind Mitigation Inspections
H. Lane Hamrick HLHamrick at Ocalafl.org
Wed Dec 9 06:45:29 EST 2009


I would like to get the popular consensus as to how other Departments are conducting their deck (roof sheathing)nailing inspections. (residential reroofs). We require a bare deck so that that the nailing can be verified (8d ring shank 6” and 6”etc.) we are located in 100 and 110 mph wind zone. We give a 2 hour window and are usually on site within the first 15 minutes of the requested window . Of course roofers tell us that “no other city or county is requiring this, they allow us to dry in and then they spot check”

H. Lane Hamrick
City of Ocala
Building Systems Inspector IV
hlhamrick at ocalafl.org<mailto:hlhamrick at ocalafl.org>
Office 352-629-8421 x 8653
Fax 352-629-6432




-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://myfloridacode.com/pipermail/codetalk/attachments/20091209/8aaa771b/attachment.html 


More information about the CodeTalk mailing list
| Home | Contractors Institute | Building Official | CI Certified | About Us | Contact Us |
| ©Copyright 2005 Contractors Institute     All rights reserved |