Please can someone get these two "gentlemen" 's email off of our forum - I
mean don't allow either one of them access for misusing this forum.

 

Rachelle Wood

CSC056647

 

  _____  

From: codetalk-bounces at myfloridacode.com
[mailto:codetalk-bounces at myfloridacode.com] On Behalf Of Sam Nasser
Sent: Friday, January 08, 2010 3:11 PM
To: codetalk at myfloridacode.com
Subject: [Florida Code Talk] Response to MEllis BASELSS remarks

 

This forum is to ask and to respond to questions pertaining to Florida
Building Code so that we all learn from each other and the experiences we
have.

It is NOT intended to post personal issues or vent out. However, since Mr.
Ellis MISSTATED & MISREPRESENTED MOST EVERYTHING, I feel compelled so put in
your hands the facts as follows:

 

1. Mr. Ellis stated in writing that he completed and passed rough Electric
and requested and got paid $20,000 for doing so.

   Few days later I was shocked to learn that rough electric was disapproved
with penalty as you see below: 

 


Inspections for Permit Number: 000 000 ELEC 00 - ELECTRICAL PERMIT 

 


 


 


 


 
<https://egov.aspgov.com/ovdoc2gbp/InspectionStatusA.jsp?structureNumber=000
&structureSequence=000&permitType=ELEC&permitSequence=00&page=1&permitTypeCo
deDescription=ELECTRICAL+PERMIT+++++++++++++> Previous Page

 


 


 Inspection Type 

 Sched Date 

 Status 

 Results Date 


 ELEC
<https://egov.aspgov.com/ovdoc2gbp/InspectionStatusB.jsp?permitTypeCodeDescr
iption=ELECTRICAL+PERMIT+++++++++++++&inspectType=ELRI&inspectSeq=0001&resul
tsDate=091809&resultsStatus=DISAPPROVED+WITH+PENALTY+&inspectDesc=ELEC+ROUGH
++++++++++++++++++++>  ROUGH  

 09/18/09 

 DISAPPROVED WITH PENALTY  

 09/18/09 

 

				

2. Mr. Ellis had all the time on earth to do his work but he provide one
electrician and the work done as described by others, is NOT to code and
needs to be

   redone as stated by electrical contractors who came to bid on the work
and stated, verbatim, the following:

 

  "1-All the mc cables need to be re strapped right on the walls and the
wood truss in all 15 

    units.They are not done to code.

 

    2-All the lights cr need to be pulled in and piped in all 15 units. Note
done yet. 

 

    3-All phone pipes need to be re done and mounted right and glued
together in all 15 units. Not one right.

 

    4-All ac pipes need to be re done, glued and re piped in all 15 units.
Not done yet and what is done is not to code.

 

    5-All panels need to be flipped over and new service wire pulled in to
all 15 units. Not done to code.

 

    6-All out side plugs need to be on house panel not off of in unit panel
in all 15 units. 

 

    7-All cr need to be traced out so we know where they go and wired right
for all 15 units.

 

    8- The garage units need bigger service wire pulled to it. The current
one is too small for a car garage unit. 

 

    9-All 15 units need the bath room light and fan done right. They are not
wired right.

 

   10-Pull strings need to be pulled in to all a/c and telephone pipes in
all 15 units. Not done yet.

 

   11-Add plugs where need be to per code, not a made up print in all 15
units.

 

   12-Add lights and plugs up where Air handler units are as per code for
all 15 units. 

 

   13-Fix the ground out at the service. Done wrongly 100%.

 

   14-All house panel wiring need to be strapped and checked.

 

   15- All work in units need to be done right, what is done is poor
workmanship 100%."

 

3. Mr. Ellis abandoned this project and stopped work since September because
we refused to sign a change order he requested for work that is clearly
stated in his 

    proposal and is an integral part of his scope of work.

 

4.  Mr. Ellis did not scheduled any inspections and have not done hardly any
work since September in spite of repeated requests to do finish his work

 

5. Mr. Ellis refused to provide 17 electric panel covers we paid him $10,000
to install.

 

6. The hold is NOT on the permit held by Mr. Ellis. It is on the permit the
City issued to the new Electrical contractor we hired AFTER we fired Mr.
Ellis.

 

7. We did NOT hire any mediators. The person Mr. Ellis referred to is a
personal friend of his who happened to have worked for us and called me
offering to resolve this as  

  "Christian brothers" which I welcomed. In fact we did agree to resolve the
matter but TWO days later, Mr. Ellis changed the agreement which I refused. 

 

8. After waiting on Mr. Ellis for three months with NO work done and no
progress, I gave up and fired him. Wouldn't ALL of you do the same when
confronted with this   

    unprofessional work and fiasco???

 

9. The matter is being handled by DBPR and the legal process and I feel
sorry for wasting your time and boring all of you with this trivial stuff
Mr. Ellis brought on.

    Therefore, I will NOT write about it again because this is NOT the place
for it.

 

Kind regards,

Sam Nasser

-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://myfloridacode.com/pipermail/codetalk/attachments/20100108/325f1ca3/attachment.html 
-------------- next part --------------
A non-text attachment was scrubbed...
Name: not available
Type: image/gif
Size: 1320 bytes
Desc: not available
Url : http://myfloridacode.com/pipermail/codetalk/attachments/20100108/325f1ca3/attachment.gif 


More information about the CodeTalk mailing list
| Home | Contractors Institute | Building Official | CI Certified | About Us | Contact Us |
| ©Copyright 2005 Contractors Institute     All rights reserved |